News
-
Milestone Promotes Construction Safety at the University of New Haven

Fall 2025
This fall, Milestone Construction Services had the opportunity to visit the University of New Haven’s Civil Engineering class for an open discussion on construction safety. Professor Hafiz Oyediran welcomed Milestone representatives Anthony Fiondella and Michael Iovene, who shared insight on the importance of maintaining safe practices throughout every stage of a project.
With guidance from owner Frank Ferraiolo, Milestone remains committed to supporting education and promoting safety awareness across the industry. The visit provided students with a practical perspective on job site operations and emphasized the shared responsibility of creating safe, well-managed work environments. By engaging with future engineers, Milestone continues to invest in the growth and development of the next generation of construction professionals.
-
A Milestone Moment for Community Safety and Collaboration

Fall 2025
Milestone Construction Services recently celebrated the completion and ribbon cutting of the South Fire District Headquarters in Middletown, Connecticut—a project that underscores the firm’s commitment to building spaces that strengthen communities and support vital public service.
The new and expanded facility enhances the department’s ability to operate efficiently and safely while providing an updated, functional environment for firefighters and staff. Designed to support the department’s mission and future growth, the renovation and addition deliver improved operational flow, upgraded systems, and modernized spaces for training, response, and community engagement.
The ribbon-cutting ceremony brought together local officials, fire department members, and project partners to honor the collaboration that brought this important project to life. The event reflected the dedication, precision, and teamwork that carried the project from planning through completion—hallmarks of Milestone’s approach to every build.
With the South Fire District project, Milestone continues to demonstrate its commitment to creating facilities that serve people, enhance safety, and stand the test of time.
-
Delivering Performance at Every Level

Fall 2025
The Peterson Performance Center, a 12,000-square-foot fit-out for the University of New Haven, stands as a strong example of Milestone Construction Services’ ability to manage complex, fast-paced projects with precision and consistency.
This project delivered new offices for the University’s Athletic Department along with multifunctional meeting areas, kitchen and food preparation spaces, restrooms, and small conference rooms designed to support collaboration, training, and productivity. Every element was completed with careful attention to quality, coordination, and function.
Despite an accelerated schedule, the Milestone team completed the project ahead of plan, maintaining efficiency across each phase and upholding the company’s standard of excellence from start to finish. The Peterson Performance Center reflects the organization’s continued commitment to craftsmanship, teamwork, and results that demonstrate what can be achieved through coordinated effort and clear purpose.
-
University of New Haven Dorms – Summer Work

Summer 2025
At the University of New Haven, Milestone is undertaking the annual maintenance and painting of seven residence halls, including Bergami, Bethel, Bixler, and Dunham, all under a compressed summer schedule. With the fall semester rapidly approaching, our teams are rising to the challenge, navigating tight timelines with determination, coordination, and a relentless commitment to delivering high-quality student housing on time.
-
Announcing Our Strategic Relationship with Nucor for Steel Building Solutions

Summer 2025
Milestone Construction Services is proud to announce the expansion of its construction operations through a new relationship with Nucor Building Systems, a leader in the design and manufacturing of custom-engineered metal building systems for over three decades.
“This collaboration marks a significant advancement for the company as it enhances its ability to deliver high-quality, cost-effective, and versatile building solutions. With this relationship, we now have the resources and support to offer clients not only exceptional Construction Management, General Contracting, and Design-Build services, but also a dedicated team specializing in pre-engineered custom metal building systems” said Frank A. Ferraiolo, President Milestone Construction Services.
By aligning with Nucor, Milestone is now positioned to meet a broader range of project needs, bringing added value, speed, and efficiency to clients across a wide range of sectors.
-
Peterson Performance Center

Summer 2025
We are proud to be part of the Peterson Performance Center, a roughly 14,000-square-foot fit out for the University of New Haven Athletics Department.
The space includes offices and meeting rooms dedicated to the football program, as well as bathrooms, two lounges, and a kitchen. With an accelerated schedule, our team is pushing to complete the majority of work over the summer, aiming for full completion by October 1st.
Framing and ductwork are already underway, and we are honored to help bring this high-performance space to life.
-
Milestone’s Spring Newsletter Out Now

Spring 2025
What we’ve building lately… We invite you to check out our latest newsletter featuring the Hillhouse HIgh School Manufacturing Lab ribbon cutting, winter project closeouts, recently completed works, as well as new hires & promotions. Link through here to view it!
-
Introducing Our New Team Members and Promotion Announcement!

Spring 2025
Milestone is pleased to announce a series of strategic promotions and new team members that reflect the firm’s continued growth and investment in operational excellence.
Chris Gancarz has been promoted to Director of Field Operations. Since joining Milestone in 2013, Chris has brought over 15 years of experience to the company in roles ranging from Project Manager and Superintendent to Laborer. In his new position, he oversees field operations across all projects, focusing on safety, scheduling, labor coordination, and quality control.
Stan Cichy has joined Milestone as Director of the General Trades Division, bringing more than 25 years of experience in construction. In this role, Stan will lead Milestone’s self-performing crew, managing framing, drywall, and finish carpentry work with a focus on precision and accountability.
The company also recently welcomed Lisa Griffin as Controller. With more than 30 years of experience in both construction and public accounting, Lisa now oversees accounting, payroll, human resources, and the financial management of Milestone’s projects.
Additionally, Christian Cimino joins the team with a background in affordable housing, specialized facilities, and high-rise construction. His strong project management skills and focus on sustainability bring added strength to Milestone’s growing roster of talent.
“These team members reflect the strength and depth of talent we continue to cultivate at Milestone,” said Frank Ferraiolo, President. “Their combined leadership and expertise help ensure we’re delivering exceptional results for our clients while building a strong foundation for future growth.”
Milestone’s evolving leadership and internal capabilities reinforce the firm’s long-standing commitment to quality, collaboration, and continuous improvement.
-
Milestone Nears Completion of Hillhouse High School Manufacturing Lab…

Winter 2025
The full article about this news is featured in High Profile’s recent issue – link here for the full story.
-
Continuum Nearing Completion

Spring 2024
We are nearing the completion of our project for Continuum that has us renovating this 4,000 square-foot, 1900s era house into a space that will support their mission to help rebuild lives.
Its prior use was as a three-family home – the renovation required that it be brought up to code for its new use. This meant a full interior demo and removal of systems as well as abatement of asbestos. Once that was complete, we then installed upgrades that included new plumbing, electrical and mechanical systems – along with modern security.
Bathrooms were renovated on all floors with new finishes throughout – the first floor was renovated to accommodate ADA specifications. Much care was taken to restore and revive historic components wherever possible. These can be seen in the hardwood refinishes of the main three story stairway, the ornate flooring of the first floor, as well as in the restoration of original doors and their hardware.
Exterior upgrades are currently underway and include upgraded storm drainage, a ramp for access, new rear porch stairs. Paving a new parking lot and installing perimeter fencing will complete the project in the coming month.
Stay tuned!




